Computer Printed Backdrops

IMG 1384
I've had a few of my backdrops in place for a few years, but this month I am installing them en masse. I thought I would share the process. There are a number of companies that have offered long backdrops on vinyl and other materials, but they tend t...
Continue reading
Rate this blog entry:
1100 Hits

Just Checking In...

IMG 1351
Been a while since I posted a progress report on the PRR Middle Division. My only "track goal" for this quarter was to complete the Lewistown (LN) portion of the Milroy Secondary, which amounted to less than three feet of flex track. In the image abo...
Continue reading
Rate this blog entry:
802 Hits

Report of the Chief Engineer, Q2 2016

IMG 1163
As another quarter comes to a close, I share this update on the PRR Middle Division in HO Scale. This quarter brought the completion of suburban Lewistown (3902) on the Milroy Secondary. This section of the line required a somewhat complicated dual-s...
Continue reading
Rate this blog entry:
854 Hits

Prepping for Open House

IMG 1204
  As previously announced, the Pennsylvania Railroad Middle Division in HO Scale will host an open house in conjunction with the annual meeting of the Pennsylvania Railroad Technical & Historical Society (PRRT&HS) next week. While the ro...
Continue reading
Rate this blog entry:
858 Hits

Lewistown Declared Operational

IMG 1161
Lewistown (3902), a mile of the Milroy Secondary in the suburbs of town, has been declared operational. This location is near present day US 22/322 at the Electric Avenue exit. This was the last link to making the Milroy Secondary operational. It als...
Continue reading
Rate this blog entry:
778 Hits