Pennsy News

Keystone Crossings... your source for everything Pennsy!

Report of the Chief Engineer, Q4 2016

IMG 1727 tThe Chief Engineer of the PRR Middle Division in HO Scale is pleased to present its report of progress as of the end of fourth quarter 2016. A goal for Q4 was to complete location Lewistown (LN), consisting of the Lewistown Secondary from the Juniata...
Rate this blog entry:
Continue reading
413 Hits

Lewistown Progress

IMG 1521Progress continues on the downtown leg of Lewistown, designated "LN" in the CT1000. All of the trackage below is now wired and operational. I am now working on the bridge where the line crosses the Juniata River to get to the Lewistown yard and stati...
Rate this blog entry:
Continue reading
374 Hits

Downtown Lewistown Progress

IMG 1471The PRR Middle Division in HO Scale is making progress on laying trackage through downtown Lewistown. This section will finally link the lower level -- the main line -- with the upper level -- the Milroy secondary. An open house was held on November ...
Rate this blog entry:
Continue reading
430 Hits

PRR Middle Division in HO Scale Open House Slated

IMG 1264Jerry Britton's PRR Middle Division in HO Scale has scheduled a public open house on Saturday, November 5, 2016, from 12:00 - 3:00 p.m. The address and map is available from The Model Railroad Open House web site, referenced below. The model railroad...
Rate this blog entry:
Continue reading
561 Hits

More Backdrops

IMG 1428Got many more backdrops installed on the PRR Middle Division in HO Scale today. All but about 10 feet are completed around the railroad. These are all color laser printed from documents sold by LARC Products. The lead image is Ryde, which is west of ...
Rate this blog entry:
Continue reading
462 Hits